
Channel letters fitting
Ask us for the clip that matches your order.
Most overseas customers fit their signs themselves. Every sign ships with the specified mounting hardware and a project-specific fitting guide — and our team is available online if you need a hand.

Overseas buyers are often hands-on and prefer to fit the sign themselves. That is why the fitting guide is written for a non-specialist: a clear mounting diagram, the exact hardware list, wiring notes and the order of steps.
If a question comes up on site, send a photo or a short message — we reply with the next practical step. TTG SIGN does not provide on-site installation service; the guidance and hardware are included with the sign.
The final fitting guide is issued per project with the production drawing.
Use the supplied 1:1 template to mark stud positions on the wall.
Drill and fix studs or stand-offs per the wall material.
Connect to the specified DC driver and test before final seating.
Level the letters, tighten and check the halo / face illumination.
Short installation clips are available for each sign family — ask us for the one that matches your order.
Signs connect to a low-voltage DC driver. Final connection to mains power should follow local regulations; we provide wiring notes and the driver specification with each project.
Selected mounting hardware and a 1:1 layout template are supplied with the sign. The exact list is confirmed in the production drawing.
TTG SIGN does not provide on-site installation. The signs are designed for self-fitting with online assistance from our team.
Photograph the packaging and the part on arrival and contact us with the order reference. Replacement handling is described in the quotation and packing note.
Send us your requirements and our team will come back with the next practical step — normally within 24 hours.